Galvanised Poles Australia was tasked with supplying the poles for the phone tower on The Great Victorian Sculpture Trail project, that Robbie Rowland turned into the art piece “Responding”.
Completed structure of the phone tower for The Great Victorian Sculpture Trail – Photo by Robbie Rowland
Video by Thirdrow Films
Feature Image by Robbie Rowland, the original image can be found at ROBBIE ROWLANDS as well as information and photos of more artwork he has made.
[vc_row][vc_column][vc_column_text]Client: Monodelphous Location: Rio Tinto Iron Ore Stock Pile Karratha
These pictures were taken when we were fortunate to experience a strong westerly wind and were able to witness the tower achieve great coverage over the intended stockpile area with water particles reaching the middle of the stockpile with the minimum 15 knot wind.
[vc_row][vc_column][vc_column_text]30 meter sport lighting column, including custom designed access door which has provided the customer with lower installation costs as well as lower maintenance costs.[/vc_column_text][us_grid columns=”4″ post_type=”attachment” items_quantity=”” images=”401,402,403,404,405,406,407,408,409″ orderby=”post__in” items_gap=”4px” items_layout=”gallery_default” img_size=”us_600_600_crop” overriding_link=”popup_post_image” breakpoint_1_cols=”4″ breakpoint_2_width=”768px” breakpoint_3_width=”480px” breakpoint_2_cols=”4″ breakpoint_3_cols=”2″][/vc_column][/vc_row]
[vc_row][vc_column][vc_column_text]In very short timeframe GPA was able to deliver a custom designed 17.9 meter hydraulic (bottom hinged) floodlight column. Delivered 36 days from receipt of order[/vc_column_text][us_image image=”412″][/vc_column][/vc_row]